Typical tasks
Moving or adding points, replacing switches and sockets, installing light fixtures and preparing outlets within the renovation area.
Electrical and lighting
We coordinate points before skim coat and painting so infrastructure, wall repair and final finish happen in the right order.
Moving or adding points, replacing switches and sockets, installing light fixtures and preparing outlets within the renovation area.
The existing wiring, panel, wall type and access must be reviewed before agreeing a safe scope and work sequence.
Points and channels come first, followed by wall restoration, skim coat and final painting.
FAQ
Yes, after checking the location, existing line and a safe solution.
Yes, installation and point preparation can be included in the renovation scope.
Before final skim coat and painting so the wall can be restored cleanly.
CEVA PLUS
Choose the work type, get a first price range and send the details for inspection.